Inspection Dates- 3 Year Re-inspection

Certificate of 3 Year Re-inspection - Latest Certification Dated April 6, 2015

Inspection Dates- 6 month periodic inspections

6-Month Periodic Inspection - Latest Inspection Dated: November 18, 2016

Letter of Certification that portables are asbestos free.

Remediation and Abatement Work Completed

District Documents:

Area Management Plan May 1989

5- Year Deferred Maintenance Plan

 

 

Model AHERA 

 

CAPISTRANO UNIFIED DESIGNED PERSON
    No Designated Person is Currently Named for Public Contact
12/10/88   Kenneth W. Harker Safety/Energy Coordinator Maintenance & Operation

 

INSPECTION DATES - CERTIFICATION OF 3 YEAR RE-INSPECTION
Next  3 Year Certification is due April 2018   
04/06/15   Dennis P Hanna #92-0016
MISSING 2014    
08/29/11   Dennis P Hanna #92-0016
08/26/08    Dennis P Hanna #92-0016 
MISSING 2007    
MISSING 2004    
07/09/01    Inspector Ken Harker #704 
07/07/98   Inspector Ken Harker #704  
05/01/95   Inspector Ken Harker #704  
06/17/92   Inspector Ken Harker #704  

 

LATEST CERTIFICATION OF 3 YEAR RE-INSPECTION DATED APRIL 6, 2015

 

 

 

INSPECTION DATES 6-MONTH PERIODIC INSPECTIONS 
11/18/16    Inspector Dennis P Hanna #92-0016 
04/05/16   Inspector Dennis P Hanna #92-0016
10/22/15    Inspector Dennis P Hanna #92-0016
08/21/14   Inspector Dennis P Hanna #92-0016
04/07/14   Inspector Dennis P Hanna #92-0016
09/04/13    Inspector Dennis P Hanna #92-0016
02/27/13   Inspector Dennis P Hanna #92-0016
09/07/12   Inspector Dennis P Hanna #92-0016
04/09/12   Inspector Dennis P Hanna #92-0016
Missing Fall 2012    
04/05/11    Inspector Dennis P Hanna #92-0016
10/04/10   Inspector Dennis P Hanna #92-0016
03/03/10    Inspector Dennis P Hanna #92-0016
09/15/09   Inspector Dennis P Hanna #92-0016 
03/02/09    Inspector Dennis P Hanna #92-0016 
Missing  Fall 2008    
Missing Spring 2008    
Missing Fall 2007    
Missing Spring 2007    
Missing Fall 2006    
Missing Spring 2006    
Missing Fall 2005    
Missing Spring 2005    
Missing Fall 2004    
Missing Spring 2004    
Missing Fall 2003    
01/07/03   Inspector Ken Harker #704
07/08/02   Inspector Ken Harker #704
01/08/02   Inspector Ken Harker #704
Missing Summer 2002    
01/08/01    Inspector Ken Harker #704
Missing Summer 2001    
07/10/00    Inspector Ken Harker #704
01/04/00    Inspector Ken Harker #704
07/06/99    Inspector Ken Harker #704
01/05/99    Inspector Ken Harker #704  
Missing Summer 1998     
01/06/98    Inspector Ken Harker #704   
07/08/97    Inspector Ken Harker #704  
01/07/97    Inspector Ken Harker #704
06/10/96   Inspector Ken Harker #704
01/08/96    Inspector Ken Harker #704
Missing Summer 1996    
01/09/95    Inspector Ken Harker #704
07/06/94    Inspector Ken Harker #704 
01/07/94   Inspector Ken Harker #704 
07/06/93    Inspector Ken Harker #704  
01/05/93    Inspector Ken Harker #704  

 

LATEST 6- MONTH PERIODIC INSPECTION DATED November 18, 2016

 

 

 

 

LETTERS OF CERTIFICATION THAT PORTABLES ARE ASBESTOS FREE
02/12/90 

Porter Jensen Hansen Manzacol Architects

Relocatable Buildings at Various Sites

Serial Numbers: 3141, 3150,3159,3167,3190,3191

02/19/91

Porter Jensen Hansen Manzacol Architects

Relocatable Buildings at Various Sites

Serial Numbers:

Aurora Job #3246

(12) 14 X 30 classroom buildings 10043 - 1054,

Aurora Job #3246

(2) 12 X 40 restroom buildings 10337- 10338,

(20) 14 X 30 classroom buildings 10339-10358

   
02/13/91

Porter Jensen Hansen Manzacol Architects

Relocatable Buildings at Various Sites

Order No. 1341 3150 3167 3190 3191

Fire doors, if present, are assumed to contain asbestos but arc considered enclosed if they are undamaged. Fire doors may by identified by the rating plate located on the inner edge of the door. Damaged fire doors were sampled a'lld assessed.

 

 

REMEDIATION/ABATEMENT October 1988 Recommended Response Actions

Report 10/10/88

 

 

 

This was the very first AHERA report showing what CUSD needed to fix by 7/9/92 (within 3 years). 

Page 2 of 6 of Report:

Item #1 Building 500 - Entire Building

  • Ceiling Panel - 11,300 square feet - (Re-sampled 5-9-91 No Asbestos Detected)

Page 3 of 6 of Report:

Item #2 Building 700 - Boiler Room Flex Joint (ABATED 8/91)

Item #3 Building 900 - Wrestling Room Vinyl Floor Tile (REMOVED Summer 1990 - no supporting documentation provided)

Page 3 & 4 of 6 of Report:

Item #4 Triton Center - Kitchen

  • Teachers Lounge 500 Flat Acoustic Spray on (ABATED 1-91)
  • Cafeteria (1000 or 2000) square feet (1000  square feet ABATED 5/97)
  • Flat Acoustic Spray on (ABATED 5/97 )
  • Cafeteria Vinyl Floor Tile (1000 or 2000) square feet (ABATED 7/97) 
  • Exterior Wall A/C panel no documentation that this was completed

Page 4 of 6 of Report:

Item #5 Library - 4,400 square feet of flat acoustic spray Edge of Library, Back of Stage (Re-sampled 5/25/1990 - No Asbestos detected)

Item #6 Shops 2 & 3

  • Storage Room Elbow Hot Water Supply (ABATED 8-91)
  • Boiler Room Flex Joint (ABATED 8-91)

Page 5 of 6 of Report:

Item #7 Building S2 - Shops 4 & 5

  • Vinyl Floor Tile 6000 square feet (S2 4 & 5 Office ABATED 8-92 through 8-94) 

(PARTIAL ABATEMENT DOCUMENTED - Room S4 only)

No documentation that S2 5 & Office were completed

Item #8 Building S3 - Shops 9, 10, 11

  • Room 59 A/C/Panel 500 Square Feet 

No documentation that S2 5 & Office were completed

Page 6 of 6 of Report:

Item #9 Theater Entrance 

  • Flat Acoustic Spray On 6000 square feet

(1000 square feet ABATED 8/91)

 

6-page report dated 10/10/1988

 

ITEM #1

Building 500 

RE-SAMPLED NO ASBESTOS DETECTED. 

Building 500 - Entire Building

Ceiling Panel Entire Building 11,300 square feet (Sample ID 7809)

Damage Assessment: Damaged

Priority Rating: 2

Required Clean-up: 7/9/89 to 7/9/92

Estimated Cost:

  • Repair Cost: $12,000
  • Removal Cost: $45,200

Re-sampled 5-9-91

Testing Cost: $1,625

  • HI-Tech $1,200
  • Abatec  $ 425

No Asbestos Detected.

They did not fix anything on this item because the report came back

NO ASBESTOS DETECTED. 

 

Date: 1-11-91 Air Monitoring with TEM Anaylsis of Samples - Cost $1,200

01-05-91 San Clemente High School - Sample Testing $425.00

07-05-91 No Asbestos was Detected

  • Ceiling Panel Room 500: Sample SCH-01, SCH-02, SCH-03, SCH-08
  • Ceiling Panel Science Office: Sample SCH-04
  • Ceiling Panel Room 504: Sample SCH-05
  • Ceiling Panel Room 506: Sample SCH-06, SCH-07

ITEM #2 

Building 700

ABATED 08/91

Building 700 Boiler Room Flex Joint (Sample ID 7802)

Damage Assessment: Damaged

Priority Rating: 3

Required Clean-up: 7/9/89 to 7/9/92

  • Removal $675.00

Abated 8-91

Refer to Project Book

Boiler Room Flex Joint ABATED 08/91

 

 

 

 

7-1-97 Test Insulation of wiring.

HI-Tech Environmental and Laboratory Services 

Tested Wiring insulation

ITEM #3

Wrestling Room

ABATED Removed Vinyl flooring summer 1990

Building 900 Wrestling Room 

Vinyl Floor 700 square feet

 

REMOVED Summer 1990

No Supporting Documentation Provided

ITEM #4

Triton Center 

TEACHERS LOUNGE CEILING ABATED 8/91

CAFETERIA CEILING ABATED 5/97

CAFETERIA FLOOR ABATED 5/97

 

 

 

Triton Center

Lounge/Cafeteria 2,500 square feet of flat acoustic spray on (Sample ID A-7756)

  • Teachers Lounge 500 square feet
  • Cafeteria 2000 square feet

Damage Assessment: Potential for Damage

Priority Rating: 8

Required Clean-up: 7/9/89 to 7/9/92

Estimated Cost:

  • Removal of 2,500 square feet of tile:  $12,000 

 

TRITON CENTER:

1) Teachers Lounge: Flat Acoustic Spray On

The Teachers Lounge was tested and no asbestos was found. CUSD removed 500 square feet of ceiling tile and replaced it.

Cost: Abatec $6,500

ABATED 8/91

2) Cafeteria:

2000 square feet of Flat Acoustic Spray On ceiling panel 

Cost: Abatec

Removal $9,000

Repair $7,200

ABATED 5/97

3) Cafeteria:

1000 square feet Vinyl Floor Tile 

Cost: Abatec $13,080

ABATED 5/97

4) Exterior Wall A/C panel 

There is no records to support that this Item has been ABATED.

 

01-11-91 San Clemente High School - Teachers Lounge Cost $6,500

Removal, Encapsulation, Air Monitoring (except Clearances) Disposal.

05-27-97 San Clemente High School - Triton Auditorium

Removal of floor tile and mastic from Auditorium, Ticket Booth and adjacent hallways

 

05-27-97 San Clemente High School - Triton Auditorium

Removal and Disposal of Sprayed Ceiling

05-21-97 San Clemente High School - Triton Auditorium

Repair/Respray Ceiling

 

ITEM #5 

Library

RE-TESTED NO ASBESTOS DETECTED. NO WORK COMPLETED

Library Mechanical Room 4,400 square feet of flat acoustic spray Edge of Library, Back of Stage (Sample ID 7768)

Damage Assessment: Potential for Damage

Priority Rating: 8

Required Clean-up: 7/9/89 to 7/9/92

  • Removal $21,120

Re-sampled 5-25-1990

No Asbestos Detected.

They did not fix anything on this item because the report came back

NO ASBESTOS DETECTED. 

 

 

ITEM #6 

Building S2 Shops 2 & 3

Storage Room 

Boiler Room

ABATED 8/91 

Shops 2 & 3 Flex Elbow (Sample ID 7828)

Damage Assessment: Potential for Damage

Priority Rating: 8

Required Clean-up: 7/9/89 to 7/9/92

  • Removal $225 (2) = $450.00

Shops 2 & 3 Flex Joint (Sample ID 7832)

Damage Assessment: Damaged

Priority Rating: 8

Required Clean-up: 7/9/89 to 7/9/92

  • Removal $225 (1)

 

Storage Room Elbow Hot Water Supply (ABATED 8-91)

Boiler Room Flex Joint

ABATED 8-91

ITEM #7

Building S2 Shops 4 & 5

PARTIAL ABATEMENT 6/99 

Item #7 Building S2 - Shops 4 & 5

  • Vinyl Floor Tile 6000 square feet  

06/03 Room S-4 Removed Floor Tile

Cost $500.00

 

Room S-4 Flooring Removed 6/92

PARTIAL ABATMENT

Vinyl Floor Tile 6000 square feet (S 4 & 5 Office ABATED 8-92 through 8-94) 

 

06/03/1992 Room S-4 Removed Floor Tile

 

ITEM #8

Building S3 Shops 9, 10, 11

Item #8 Building S3 - Shops 9, 10, 11

  • Room 59 A/C/Panel 500 Square Feet
 

ITEM #9

PARTIAL ABATEMENT

Item #9 Theater Entrance 

  • Flat Acoustic Spray On 6000 square feet (1000 square feet ABATED 8/91)

Flat Acoustic Spray On 6000 square feet (1000 square feet ABATED 8/91)

 

08/01/91 San Clemente High Ticket Booth

Wet Removal of Asbestos Containing Transit Facia Boards.

 

 

ABATEMENT COST ESTIMATE

 

NOT ON ORIGINAL REPORT

Building 200 

7-27-1998

San Clemente High School Asbestos Removal and Disposal

Building 200 -Asbestos Abatement Roofing Facia 

NOT ON ORIGINAL REPORT

Classroom Building Skylights

10-10-2001

San Clemente High School Asbestos Removal and Disposal

Classroom Buildings San Clemente High - Skylights

NOT ON ORIGINAL REPORT 

Restroom Building R-2

7-25-2002

San Clemente High School Asbestos Removal and Disposal

Restroom Building R-2

 

NOT ON ORIGINAL REPORT 

Auto Shop

6-8-2001 

San Clemente High School Asbestos Removal and Disposal

AUTO SHOP

 

REMEDIATION/ABATEMENT - AHERA  SURVEY PERIODIC SURVEILLANCE PLAN 10/10/88
 

page 1: BUILDING 100  - PORTABLE 14-15

Page 2 Building 200 - Building 300

page 3 EXTERIOR WALK - BUILDING 400

page 4 BUILDING 500

page 5 BUILDING 600 - BUILDING 700 - BUILDING 900

page 6 WRESTLING ROOM - ADMINISTRATION

page 7 BUILDING C TRITON CENTER - BUILDING L LIBRARY

 

page 7 BUILDING L LIBRARY

page 9 EDGE OF LIBRARY, BACK STAGE

page 10 SHOPS 2 & 3

page 11 SHOPS 4 -5, SHOPS 9-10-11

page 12 LITTLE THEATER