REMEDIATION/ABATEMENT October 1988 Recommended Response Actions |
Report 10/10/88
|
This was the very first AHERA report showing what CUSD needed to fix by 7/9/92 (within 3 years).
Page 2 of 6 of Report:
Item #1 Building 500 - Entire Building
- Ceiling Panel - 11,300 square feet - (Re-sampled 5-9-91 No Asbestos Detected)
Page 3 of 6 of Report:
Item #2 Building 700 - Boiler Room Flex Joint (ABATED 8/91)
Item #3 Building 900 - Wrestling Room Vinyl Floor Tile (REMOVED Summer 1990 - no supporting documentation provided)
Page 3 & 4 of 6 of Report:
Item #4 Triton Center - Kitchen
- Teachers Lounge 500 Flat Acoustic Spray on (ABATED 1-91)
- Cafeteria (1000 or 2000) square feet (1000 square feet ABATED 5/97)
- Flat Acoustic Spray on (ABATED 5/97 )
- Cafeteria Vinyl Floor Tile (1000 or 2000) square feet (ABATED 7/97)
- Exterior Wall A/C panel no documentation that this was completed
Page 4 of 6 of Report:
Item #5 Library - 4,400 square feet of flat acoustic spray Edge of Library, Back of Stage (Re-sampled 5/25/1990 - No Asbestos detected)
Item #6 Shops 2 & 3
- Storage Room Elbow Hot Water Supply (ABATED 8-91)
- Boiler Room Flex Joint (ABATED 8-91)
Page 5 of 6 of Report:
Item #7 Building S2 - Shops 4 & 5
- Vinyl Floor Tile 6000 square feet (S2 4 & 5 Office ABATED 8-92 through 8-94)
(PARTIAL ABATEMENT DOCUMENTED - Room S4 only)
No documentation that S2 5 & Office were completed
Item #8 Building S3 - Shops 9, 10, 11
- Room 59 A/C/Panel 500 Square Feet
No documentation that S2 5 & Office were completed
Page 6 of 6 of Report:
Item #9 Theater Entrance
- Flat Acoustic Spray On 6000 square feet
(1000 square feet ABATED 8/91)
|
|
6-page report dated 10/10/1988
 




|
ITEM #1
Building 500
RE-SAMPLED NO ASBESTOS DETECTED.
|
Building 500 - Entire Building
Ceiling Panel Entire Building 11,300 square feet (Sample ID 7809)
Damage Assessment: Damaged
Priority Rating: 2
Required Clean-up: 7/9/89 to 7/9/92
Estimated Cost:
- Repair Cost: $12,000
- Removal Cost: $45,200
|
Re-sampled 5-9-91
Testing Cost: $1,625
- HI-Tech $1,200
- Abatec $ 425
No Asbestos Detected.
They did not fix anything on this item because the report came back
NO ASBESTOS DETECTED.
|
|
Date: 1-11-91 Air Monitoring with TEM Anaylsis of Samples - Cost $1,200

01-05-91 San Clemente High School - Sample Testing $425.00

07-05-91 No Asbestos was Detected
- Ceiling Panel Room 500: Sample SCH-01, SCH-02, SCH-03, SCH-08
- Ceiling Panel Science Office: Sample SCH-04
- Ceiling Panel Room 504: Sample SCH-05
- Ceiling Panel Room 506: Sample SCH-06, SCH-07



|
ITEM #2
Building 700
ABATED 08/91
|
Building 700 Boiler Room Flex Joint (Sample ID 7802)
Damage Assessment: Damaged
Priority Rating: 3
Required Clean-up: 7/9/89 to 7/9/92
|
Abated 8-91
Refer to Project Book
Boiler Room Flex Joint ABATED 08/91
|
|
7-1-97 Test Insulation of wiring.
HI-Tech Environmental and Laboratory Services
Tested Wiring insulation

|
ITEM #3
Wrestling Room
ABATED Removed Vinyl flooring summer 1990
|
Building 900 Wrestling Room
Vinyl Floor 700 square feet
|
REMOVED Summer 1990
No Supporting Documentation Provided
|
ITEM #4
Triton Center
TEACHERS LOUNGE CEILING ABATED 8/91
CAFETERIA CEILING ABATED 5/97
CAFETERIA FLOOR ABATED 5/97
|
Triton Center
Lounge/Cafeteria 2,500 square feet of flat acoustic spray on (Sample ID A-7756)
- Teachers Lounge 500 square feet
- Cafeteria 2000 square feet
Damage Assessment: Potential for Damage
Priority Rating: 8
Required Clean-up: 7/9/89 to 7/9/92
Estimated Cost:
- Removal of 2,500 square feet of tile: $12,000
|
TRITON CENTER:
1) Teachers Lounge: Flat Acoustic Spray On
The Teachers Lounge was tested and no asbestos was found. CUSD removed 500 square feet of ceiling tile and replaced it.
Cost: Abatec $6,500
ABATED 8/91
2) Cafeteria:
2000 square feet of Flat Acoustic Spray On ceiling panel
Cost: Abatec
Removal $9,000
Repair $7,200
ABATED 5/97
3) Cafeteria:
1000 square feet Vinyl Floor Tile
Cost: Abatec $13,080
ABATED 5/97
4) Exterior Wall A/C panel
There is no records to support that this Item has been ABATED.
|
|
01-11-91 San Clemente High School - Teachers Lounge Cost $6,500
Removal, Encapsulation, Air Monitoring (except Clearances) Disposal.

05-27-97 San Clemente High School - Triton Auditorium
Removal of floor tile and mastic from Auditorium, Ticket Booth and adjacent hallways
05-27-97 San Clemente High School - Triton Auditorium
Removal and Disposal of Sprayed Ceiling

05-21-97 San Clemente High School - Triton Auditorium
Repair/Respray Ceiling

|
ITEM #5
Library
RE-TESTED NO ASBESTOS DETECTED. NO WORK COMPLETED
|
Library Mechanical Room 4,400 square feet of flat acoustic spray Edge of Library, Back of Stage (Sample ID 7768)
Damage Assessment: Potential for Damage
Priority Rating: 8
Required Clean-up: 7/9/89 to 7/9/92
|
Re-sampled 5-25-1990
No Asbestos Detected.
They did not fix anything on this item because the report came back
NO ASBESTOS DETECTED.
|
|

|
ITEM #6
Building S2 Shops 2 & 3
Storage Room
Boiler Room
ABATED 8/91
|
Shops 2 & 3 Flex Elbow (Sample ID 7828)
Damage Assessment: Potential for Damage
Priority Rating: 8
Required Clean-up: 7/9/89 to 7/9/92
- Removal $225 (2) = $450.00
Shops 2 & 3 Flex Joint (Sample ID 7832)
Damage Assessment: Damaged
Priority Rating: 8
Required Clean-up: 7/9/89 to 7/9/92
|
Storage Room Elbow Hot Water Supply (ABATED 8-91)
Boiler Room Flex Joint
ABATED 8-91
|
ITEM #7
Building S2 Shops 4 & 5
PARTIAL ABATEMENT 6/99
|
Item #7 Building S2 - Shops 4 & 5
- Vinyl Floor Tile 6000 square feet
06/03 Room S-4 Removed Floor Tile
Cost $500.00
|
Room S-4 Flooring Removed 6/92
PARTIAL ABATMENT
Vinyl Floor Tile 6000 square feet (S 4 & 5 Office ABATED 8-92 through 8-94)
|
|
06/03/1992 Room S-4 Removed Floor Tile

|
ITEM #8
Building S3 Shops 9, 10, 11
|
Item #8 Building S3 - Shops 9, 10, 11
- Room 59 A/C/Panel 500 Square Feet
|
|
ITEM #9
PARTIAL ABATEMENT
|
Item #9 Theater Entrance
- Flat Acoustic Spray On 6000 square feet (1000 square feet ABATED 8/91)
|
Flat Acoustic Spray On 6000 square feet (1000 square feet ABATED 8/91)
|
|
08/01/91 San Clemente High Ticket Booth
Wet Removal of Asbestos Containing Transit Facia Boards.

|
|
ABATEMENT COST ESTIMATE

|
NOT ON ORIGINAL REPORT
Building 200
|
7-27-1998
San Clemente High School Asbestos Removal and Disposal
Building 200 -Asbestos Abatement Roofing Facia

|
NOT ON ORIGINAL REPORT
Classroom Building Skylights
|
10-10-2001
San Clemente High School Asbestos Removal and Disposal
Classroom Buildings San Clemente High - Skylights




|
NOT ON ORIGINAL REPORT
Restroom Building R-2
|
7-25-2002
San Clemente High School Asbestos Removal and Disposal
Restroom Building R-2



|
NOT ON ORIGINAL REPORT
Auto Shop
|
6-8-2001
San Clemente High School Asbestos Removal and Disposal
AUTO SHOP

|